The building of manufacturing and storage facility with social and office zone, a laboratory, technical facilities as well as external infrastructure. The plant manufactures masterbatches for colouring plastics.
ADMINISTRATIVE AND SOCIAL BUILDING
This medium-height building with 3 levels does not have the basement and was designed according to traditional technology, covered with flat roof. It has a rectangular form and forms part of the realization following higher finishing standard.
LABORATORY AND WORKSHOP BUILDING
The building is not high with its 3 levels (ground floor + first floor + mezzanine with separated technical space) without basement, designed according to traditional technology, covered with flat roof. It has a rectangular form, inserted between the administrative and social building and the manufacturing facility.
fot.: Robert Fedejko